Gold Member Since 2014
Audited Supplier
Suzhou CMT Engineering Company Limited

Ferrosilicon Furnace, Ferrosilicon Plant, Ferrosilicon Making Machine manufacturer / supplier in China, offering Ferrosilicon Making Furnace/Ferrosilicon Production Line, 2018 Stone Paper Making Production Line, Two Shaft Shredder (S41 Series) and so on.

(/ )

Supplier Homepage Product Mining & Metallurgy Turnkey Project Ferrosilicon Making Furnace/Ferrosilicon Production Line

Ferrosilicon Making Furnace/Ferrosilicon Production Line

FOB Price: Get Latest Price
Min. Order: 1 Piece
Production Capacity: 18mva
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Whole machine line
  • Condition: New
  • Automatic Grade: Automatic
  • Certification: ISO, CE
  • Usage: Industrial
  • Raw Material: Ilica,Carbonaceous Reducing Agent,Iron-Bearing,etc
  • Specification: SGS
  • Customized: Customized
  • Power Source: Electric
  • Type: Sintering Furnace
  • Capacity: 18mva
  • Media: Organic Heat Transfer Material
  • Trademark: CMT
  • Origin: Jiangsu Suzhou
Product Description
Technical process flow

Ferrosilicon is the alloy of silicon and iron,the ferrosilicon production belongs to slag-free submerged arc smelting. Carbonaceous reducing agent (coke,semi-coke,etc), iron-bearing material and silica are mixed according to a certain proportion then go into the furnace,the ferrosilicon is obtained through chemical reaction under high temperature by taking advantage of the arc heat.
The qualified materials (large bulk need crushing) go through  material proportioning,lifting,distribution and feeding system,then after mixture (the mixture of silica,carbonaceous reducing agent,iron-bearing material) go into the furnace heart for smelting. The ferrosilicon is obtained through oxidation-reduction reaction under high temperature in the furnace heart,then after opening the furnace mouth through the arc burner (mutegun),the silicon hot metal flows into the ladle,then the ladle shall be transported to the pouring workshop for pouring via ladle trolley,at last,the ferrosilicon, after cooling,shall be crushed,packed,measured and stored).
    The smoke generated from the ferrosilicon production goes through bag dedusting equipment for dust removing,then the purified smoke discharges into the air,at last condensing and packaging the processed dust.

Main equipment

Material preparation, burdening, material loading system
Feeding and Burden distribution system
Electrode Stability Control 
Short net system
Furnace shell parts
Gas hood
Purging system
At the front of furnace and subsidiary tools
Hydraulic system
Water cooling system
Circulating water system

For more information,pls feel free to contact us.

Send your message to this supplier
Avatar
Ms. Amber
*From:
To: Ms. Amber
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now