The Machine List:
1)Rotatable reactor:Q245R Boiler plate:2200mm*6000mm 14mm
2)Machine cover:4 pieces
3)Main machine base
4)Oil separator:1000mm*1800mm 8mm
5)Catalyst tower:325mm*1500mm*12mm
6)Cooling system(either is ok)
Vertical condensers:2 setting tanks & 2 sets 1000mm*3500mm condensers
Coil cooling system:3 setting tanks and 22 pipes 108mm
7)Light oil tank:1200mm*3500mm 5mm
8)Heavy oil tank:800*1800mm 5mm
9)Water sealing tank:1000*1500mm 5mm
10)Cooling tower:50MT/HOUR
11)Induced draft fan(Chinese standard ):4KW
12)Speed reducer(Chinese standard ):3KW
13)Dust remove system:1000mm*4500mm 5mm
14)Flue condenser
15)Waste gas burners:4 sets
16)Blowers:4sets
17)Electric cabinet
18)The pressure automatic alarm
19)Water pump:1.5KW
20)Oil pump :1.5KW
21) Chimney:273mm*6000mm
22) Automatic slag discharge system
23) Take steel wire out automatic machine
24)Tyre cut machine
25) Conveyor belt
26) Auto feeder
Factory needed area:
All equipments Needed around 300m2, Length: 22m, Width: 14m, Height: 5-6m; Excluding raw material area. The workshop can be simple shed.
Payment terms:
First pay 30% T/T as the advance payment;
Seconded pay 70% T/T before delivery from our manufactory;
Lead time: After advance payment 25days.
Packing: 2 units of 40'HQ.
Note:
1. The seller sends the foundation drawings to the buyer after make the order and advance payment.
2. The seller send engineer to buyer when machine reach buyer's factory. The engineers do the installation, and then guiding and training the buyer's workers operate and repair the equipment. The buyer should be responsible for each of our technician's accommodation, meals, round-trip tickets, self-security and USD 80 per day abroad.
3. The seller Telefax the BL, packing list and certificate of origin to buyer after delivery machine.
4. Guarantee terms: We guarantee the complete machine two years. Normally, the reactor can be used for
more than 4 years. Other parts no need be changed lifelong time expect the wearing parts.
Raw material |
Waste tire , Waste rubber, Waste plastic |
Oil yield/day |
Waste tire/rubber |
Big tyres |
45%-50% |
Car tyres |
40% |
Bicycles and motorcycles tyres |
30%-35% |
Waste Plastic
|
Fishing net ,
safety net, farm-oriented film |
45%-50% |
Convenient bags, weave bags |
40% |
Off-cut of recycled paper mill |
20%-30% |
PE |
70% |
PVC |
45 - 50% |
PP |
30% |
Structural Form |
Horizontal |
Capacity/day |
3 batches/ 2 days |
Raw material |
245R Boiler Steel plate |
Operating pressure |
Normal pressure |
Power |
Coal, wood, natural gas or fuel oil |
Mode of cooling |
Water-cooling |
Working form |
Intermittent |
24 hour disposal amount |
5 tons of raw material |
24 hour oil yield |
Depends on oil output rate |
Rotate speed of main equipment |
0.4 turn / m |
Power in total |
11 KW / hour |
Heating mode |
Direct heating |
Noised B ( A ) |
≤85 |