Jiangsu, China
Business Type:
Manufacturer/Factory, Trading Company, Group Corporation
Business Range:
Industrial Equipment & Components, Manufacturing & Processing Machinery, Metallurgy, ...
Type of Ownership:
Limited Company
Main Markets:
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, ...
Terms of Payment:
LC, T/T
OEM/ODM Service

Shot Blasting Machine Line, Plate Surface Cleaning Line, Plate Surface Brushing Machines manufacturer / supplier in China, offering Plate Surface Brushing Machine Line, Energy Plant for Wood-Based Panel Production Line, OSB (Oriented Strand Board) Production Line and so on.

Gold Member Since 2014
Audited Supplier

Plate Surface Brushing Machine Line

Get Latest Price
Min. Order / Reference FOB Price
1 Square Meter US $750,000-1,500,000/ Square Meter
Port: Shanghai, China
Production Capacity: 0.5~2m/Min
Payment Terms: L/C, T/T, D/P, Western Union
Drive: Electric
Principle: Press-in
Control: PLC
Layout: Horizontal
Automation: Automatic
Certification: ISO, SGS

You Might Also Like

Loading...

Basic Info

Model NO.: CMT
Cleaning Speed: 0.5~2m/Min
Cast Steel Shot: 0.8~1.4mm
Cleaning Workpieces: 8000*2500*200mm
Blasting Capacity: 6*220kg/Min
Impeller Speed: 3000rpm
Type: Steel Plate
Surface Treatment: Shot Blasting
Technique: Hot Rolled
Application: Flange Plate, Container Plate
Special Use: Wear Resistant Steel
Trademark: CMT
Specification: SGS
Origin: Jiangsu Suzhou

Product Description


Work principle and process of the equipment:

When shot blasting machine begins to work, open dedusting system, separator, elevator, screw conveyor, roller systems in turn , then open blasting wheel, machine is ready to work. The workpieces are loaded to the inlet roller of blasting chamber, the workpieces go through the roller into the shot blasting chamber. There is test device in the entrance of the blasting chamer for workpieces testing , through PLC counting time delay, shot supplying valve opens automatically, begin shot blasting for workpieces. The workpieces go forwards while shot blasting, in order to clear surface oxide, welding slag, rust and dirt and so on, until leaving blasting chamber. When the workpieces end parts pass through and testing , through PLC counting time delay, the shot supplying valve turn off automatically. When Workpieces go into the outlet roller, workpieces are cleared off for one-time. Upload workpieces on the outlet roller when they leave blasting chamber completely. Repeat this process until the work is finished and stop the machine in turn.        
 

Work process:

1. Open dedusting system.
2. Open separators. 
3. Open the elevator.
4. open the Horizontal screw conveyor  
5. open the Vertical screw conveyor
6. Open the roller system.
7. Open the blaster wheel.
8. Load the workpieces to the inlet roller.
9. The workpieces go forwards, reaching to the location and open the shot gate.
10. Shot blasting, begin cleaning.
11. Completed workpiece cleaning and turn off the shot supplying gate.
12. Unload the workpieces on the outlet roller. 
14. Repeat the steps 8, 9, 10, 11, 12, . If ready to stop working, go to step 15. 
15.Turn off blasting wheel →Turn off sweeping system →Turn off the vertical screw conveyor →Turn off horizontal screw conveyor →Turn off elevators →Turn off separator →Turn off the dust collector → Turn off roller and the machine stops working.


The requests of cleaning workpieces:
NoItemTechnical parameterRemark
1Cleaning workpiecesMax size: Length 8000mm, width2500mm,height 200mm Aluminium alloy plate
2Production efficiencyCleaning speed: 0.5~2m/minFrequency control
3AbrasiveCast steel shot ∮0.8~1.4mmFor reference
 


For more information, please feel free to tell me.

Send your message to this supplier

*From:
*To:
avatar Mr. Jeremy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now