Brief introduction
1.Product: TEU Container
2.Production Capacity: 36,000pcs TEU/year
a)Number of labors: 300 worker one shift
b) Working hours: 10 hours per shift
3. Areas ( Customization & Design)
Raw materials area
Final product area
Production area
Management area
Labs and maintince area
Public uses area
Testing area
Container material: steel, wood floor, paint. A dry container is made according to the weight percentage: steel 70%, wood floor 12%, paint 3%: other 15%
Production process
1. Material processing
2. Part Machining
3. Welding
4. Painting
5. Assembly line for whole container (include: installing the floors and other accessories, sealing with glue, sticking the trademarks, making the beauty on the containers etc.)
6. Container testing
Machine lines pictures for your reference
1. Part machining & 2. Welding line
3. Finishing line & 4. Painting line
5. Container test station
More details, please feel free to contact with us.