SN. | Project |
1 | Raw materials workshop |
2 | Production unites the workshop |
2.1 | Melt the section |
2.2 | Shaping section |
2.3 | Section that anneal |
2.4 | Cut and judge the section of the finished product |
2.5 | Bits of broken glass system |
3 | Affiliated facility |
3.1 | Compress the air and stand |
3.2 | Circulating water system |
3.3 | Laboratory |
4 | Support the distribution system |
5 | System ofNatural gas |
6 | Installation and cold adjustment (cold adjustment is about 120days) |